Details

Location
Pilbara, Western Australia
Contract type
Engineering Design
Status
Completed
Sector
Mineral Processing
Expertise
Upgrades and Overhauls
Client
BHP

Overview

Working closely with BHP, we identified the underlying root cause for the belt drift delays and replicated these problems within our rocky discrete element modelling (DEM) simulations, which had never previously been achieved.  

Sedgman Onyx developed a unique and innovative chute design from concept to detailed designed. The simulations were able to demonstrate the predicted improvements to flow and the improved centralisation of the material burden onto the receiving yard belt across the full range of machine luff and slew conditions. 

The chute has been commissioned, and chute performance has eliminated the belt drift delays and allowed a rate increase for the route.  

This challenging brownfield project utilises our specialist root cause analysis and DEM capability to improve transfer chute wear life and minimise belt tracking problems.